In an ideal world, your software product would work perfectly from the get-go, but let’s face it: every software product has bugs. That’s where software testing becomes essential. Integrating software testing throughout the software development life cycle (SDLC) helps minimize or even eliminate defects. But here’s the kicker: bug fixing costs can vary greatly depending on when issues are discovered. The earlier in the SDLC, the cheaper it is to fix.
Bug Fixing Costs by SDLC Phase (2026 Data)
| Phase | Multiplier | $100 Bug | Time to Fix | Source |
|---|---|---|---|---|
| Requirements | 1x | $100 | 30 min | IBM Systems Sciences |
| Design | 5x | $500 | 2 hours | NIST |
| Development | 10x | $1,000 | 4 hours | Synopsys |
| Testing | 15x | $1,500 | 8 hours | Capers Jones |
| Production | 100x | $10,000 | 2-5 days | IBM/Ponemon |
| Post-Release + Downtime | 150x+ | $15,000+ | Days-weeks | Industry average |
The math: A bug that takes 30 minutes to fix in requirements takes 2-5 days and $10,000+ to fix in production.
Shift-Left Testing Saved $840,000
- 47 production bugs per quarter
- $18,000 average remediation cost
- Manual testing only before release
- Security scans run weekly
- 8 production bugs per quarter (83% reduction)
- $2,100 average cost (caught earlier)
- Automated API testing in CI/CD
- Security scans per commit
Per-Bug Costs by Industry (2026)
Source: Synopsys BSIMM 2025, Ponemon Institute
What causes software defects?
At the heart of it, defects happen because humans are prone to error. Developers make mistakes when writing code, which can lead to defects in the final product. Add in time pressure, the complexity of the code, and a system with many moving parts, and it’s easy to see how things can go wrong. Sometimes, external factors like environmental conditions, radiation, magnetic fields, or pollution can also affect the software’s execution and cause defects.
Looking for a QA partner who builds their own tools?
BetterQA’s 50+ engineers use 5 proprietary AI tools — included free with every engagement. No tool licensing fees, no reselling.
What is SDLC?
The Software Development Life Cycle (SDLC) is a process aimed at producing high-quality software efficiently and at a low cost. It breaks down the journey of software development into various phases.
Software Development Life Cycle Phases:
Phase 1 – Planning: This is where estimates for cost, size, and available resources are calculated for the product.
Phase 2 – Analysis & Requirement Gathering: Requirements are collected and analyzed to ensure they align with the product’s goals.
Phase 3 – Design: Here, the design approach and the programming language are chosen based on the project’s needs.
Phase 4 – Development: The actual coding happens here, and it’s often the longest phase in the SDLC.
Phase 5 – Testing: In this phase, the software is rigorously tested against the requirements. Unit testing, integration testing, and system testing all happen here.
Phase 6 – Deployment: Once everything is ready, the product is released to customers.
Phase 7 – Maintenance: After release, the product needs regular updates and bug fixes, especially if new issues arise.
Bug Fixing Costs: “Prevention is better than cure.”
So, when do the bug fixing costs really add up? The later you find the bug in the SDLC, the more it will cost to fix. It’s simple: a problem that’s caught early is cheaper to resolve.
Bug Fixing Costs: “Prevention is Better Than Cure.”
You’ve probably heard the saying, “Prevention is better than cure,” and it applies perfectly to bug fixing costs in software development. If bugs are detected later in the development cycle, fixing them becomes more complex and expensive. According to a study by IBM’s Institute for System Science, fixing a bug during the implementation phase costs six times more than finding and fixing it in the design phase. And bugs found during the testing phase? They can cost up to fifteen times more to fix.
Estimating the total bug fixing costs can be tricky. Every bug and every product is different, so various factors, such as the bug’s environment, the complexity of the code, and the tools used, all influence the cost of fixing it.
However, the high cost of fixing bugs late in the SDLC is just one part of the problem. Sometimes, when bugs are fixed in later stages, especially after deployment, fixing one issue can trigger others, causing a ripple effect of new problems. The CPSQ report from 2020 showed that poor software quality in the US alone costs $2.08 trillion annually.
Conclusion
At the end of the day, these costs are something every development team needs to account for. Whether you’re early in the SDLC or near deployment, taking proactive steps to identify and fix issues early on saves both time and money. If you’d like to learn more about bug fixing costs and how to optimize your testing processes, feel free to book a call with our professionals today.
Stay Updated with the Latest in QA
The world of software testing and quality assurance is ever-evolving. To stay abreast of the latest methodologies, tools, and best practices, bookmark our blog. We’re committed to providing in-depth insights, expert opinions, and trend analysis that can help you refine your software quality processes.
Delve deeper into a range of specialized services we offer, tailored to meet the diverse needs of modern businesses. As well, hear what our clients have to say about us on Clutch!
Stop paying 30x more to fix bugs in production
Shift-left QA catches bugs when they're cheap to fix. Our 50+ engineers integrate with your sprints from day one.
Frequently Asked Questions
Q: Why do bugs cost more to fix later in development?
A: Later-stage bugs require more rework because code is already integrated, tested, and sometimes deployed. A bug in production may require hotfixes, rollbacks, customer support, and reputation damage control—multiplying the cost by 30-100x compared to finding it in requirements.
Q: What is the 1-10-100 rule in software testing?
A: The 1-10-100 rule states that a bug costs $1 to fix in design, $10 in development, and $100 in production. This principle drives shift-left testing strategies where QA starts earlier in the SDLC.
Q: How can companies reduce bug fixing costs?
A: Companies reduce costs through early QA involvement (shift-left), automated testing in CI/CD pipelines, code reviews, clear requirements documentation, and using AI-powered testing tools that catch bugs before they reach production.
Q: Which SDLC phase has the highest bug fixing cost?
A: Production has the highest bug fixing cost—often 30-100x more than catching the same bug during requirements or design. This includes direct costs (engineering time) and indirect costs (customer churn, support tickets, brand damage).
Ready to see what AI-powered QA can do?
50+ engineers × 5 AI tools = bugs found faster. ISO 27001 + NATO NCIA certified. We build, we don’t buy.
Catch bugs early with dedicated QA
BetterQA integrates into your SDLC from day one - catching defects in requirements and design where they cost 1x, not 30x. 50+ engineers, shift-left methodology.
Calculate Your Savings“Every day you delay finding a bug, its cost doubles. The math is brutal but simple – test early, test often, or pay the price later.” — Tudor Brad, Founder of BetterQA (15+ years in QA)